News

Stay Updated: News & Developments at Boyu

Back

Is a Moisture Barrier Under Vinyl WPC Planks Essential?

When installing WPC click plank flooring, one question that frequently arises—especially among flooring retailers and contractors—is whether a moisture barrier is truly necessary. The short answer: it depends on your subfloor and location. Equally important is ensuring your subfloor is level before installation to avoid costly issues down the road. In this post, we’ll break down when a moisture barrier is needed and how to properly prepare and level your floor for a smooth, long-lasting WPC vinyl flooring installation.

 

Do You Need a Moisture Barrier for WPC Click Flooring? A Quick Checklist

While WPC click flooring is known for its water resistance, that doesn’t mean you can skip the moisture barrier entirely. Use this quick checklist to determine if your project needs one:

Concrete Subfloor

  • Above grade (2nd floor and up): Usually no barrier needed, but check manufacturer guidelines.
  • On grade or below grade (ground level or basement): Yes, a moisture barrier is strongly recommended.

Wood Subfloor

  • Dry, conditioned interior spaces: Usually no barrier required.
  • Areas prone to humidity or past moisture issues: Consider adding a vapor retarder.

Basement or High-Humidity Areas

  • Always install a moisture barrier to protect from vapor emissions.

Manufacturer Requirements

  • Some warranties may be void without a barrier on concrete. Always check the installation instructions.

Underlayment Type

  • If your WPC vinyl flooringalready includes an attached underlayment with moisture resistance, an additional barrier may not be needed—but double-check product specs.

 

How to Level the Subfloor for WPC Vinyl Flooring Installation

No matter how durable your WPC click flooring is, a poorly prepared subfloor will lead to noise, gaps, or plank damage. Follow this step-by-step guide to ensure a smooth, level base before laying your WPC planks.

1. Preparation

  • Clear the floor: Remove all debris, dust, adhesives, staples, and nails. Use a shop vacuum for thorough cleaning.
  • Inspect the surface: Check for cracks, holes, or moisture.
  • Patch small holes/cracks: Use a floor patching compound to fill and smooth out problem spots. Let dry completely.

2. Leveling Methods (Choose Based on Subfloor Condition)

  • Self-Leveling Compound (Ideal for large, uneven areas)
  • Pros: Fast, covers wide areas, smooth finish.
  • Cons: Higher cost, needs primer, sets quickly.
  • Steps:
  1. Apply primer to help adhesion.
  2. Mix the compound according to package instructions.
  3. Pour onto the floor and spread with a trowel.
  4. Use a spiked roller to remove air bubbles.
  5. Let cure fully before walking or installing planks.
  • Patching Compound / Feather Finish (For isolated dips and minor flaws)
    • Pros: Cost-effective, quick fix.
    • Cons: Not suitable for large areas.
    • Steps:
  1. Mix patch compound until smooth.
  2. Apply with a flat trowel, feathering edges.
  3. Let dry, then sand lightly if needed.
  • Sanding or Grinding High Spots
    • Pros: Effective for removing raised areas.
    • Cons: Labor-intensive, noisy, requires safety precautions.
    • Steps:
  1. Use a floor grinder or belt sander with proper grit.
  2. Wear goggles and a dust mask.
  3. Vacuum thoroughly afterward.

3. Essential Tools

  • Trowels (flat and notched)
  • Spiked roller
  • Mixing bucket & drill mixer
  • Moisture meter
  • Level (4 ft or longer)
  • Safety gear (gloves, goggles, dust mask)

4. Testing & Troubleshooting

  • Flatness test: Floor must not vary more than 3/16″ over 10 feet.
  • Moisture test: Use a moisture meter or calcium chloride test, especially on concrete.
  • Dry run: Lay a few planks without clicking them in to feel for movement or gaps.
GET IN TOUCH
Want to know more?